Google Street View of Charing
Cross Tube Station
Location: Charing Cross Tube Station, City of Westminster, London, United Kingdom (51.508°N 0.12475°W)
Website:
Charing Cross Tube Station:
Charing Cross tube station is a London Underground station at Charing Cross in the City of Westminster with entrances located in Trafalgar Square and The Strand. The station is served by the Northern and Bakerloo lines and provides an interchange with the National Rail network at Charing Cross station. On the Northern Line it is between Embankment and Leicester Square stations on the Charing Cross branch, and on the Bakerloo Line it is between Embankment and Piccadilly Circus stations. The station is in Travelcard Zone 1.
The station was served by the Jubilee Line between 1979 and 1999, acting as the southern terminus of the line during that period.
For most of the history of the Underground the name Charing Cross was associated not with this station but with the station now known as Embankment. See below for the complex history of the name.
History of Charing Cross Tube Station:
The Northern line and Bakerloo line parts of the station were originally opened as two separate stations and were combined when the now defunct Jubilee Line platforms were opened. The constituent stations also underwent a number of name changes during their history.
The first part of the complex, the Bakerloo line platforms, was opened as Trafalgar Square by the Baker Street & Waterloo Railway (BS&WR) on 10 March 1906.
The Northern line platforms were opened as Charing Cross by the Charing Cross, Euston & Hampstead Railway (CCE&HR, now the Charing Cross branch of the Northern line) on 22 June 1907. At its opening this station was the southern terminus of the CCE&HR which ran to two northern termini at Golders Green and Highgate (now Archway) tube stations.
Although both lines were owned and operated by the Underground Electric Railways Company of London (UERL), there was no direct connection below ground and passengers interchanging between the lines had to do so via two sets of lifts and the surface.
In an effort to improve interchange capabilities, the CCE&HR was extended the short distance south under Charing Cross main line station to connect with the BS&WR and the District Railway (another UERL line), opening as such on 6 April 1914. The interchange station between the BS&WR and District had been known hitherto as Charing Cross (District) and Embankment (BS&WR). The original CCE&HR terminus to the north of Charing Cross main line station was renamed Charing Cross (Strand) and the new station and the BS&WR station to the south of the main line station was named Charing Cross (Embankment). These names lasted only a short time: on 9 May 1915, Charing Cross (Strand) was renamed Strand and for Charing Cross (Embankment) the tube lines adopted the District Railway name of Charing Cross. At the same time, the separate Strand station on the Great Northern, Piccadilly and Brompton Railway was also renamed Aldwych to avoid confusion.
The Northern line Strand station was closed on 4 June 1973 to enable the construction of the new Jubilee line platforms. These platforms were constructed between the Bakerloo line and Northern line platforms together with the long-missing below-ground interchange between those two lines. In anticipation of the new interchange station, from 4 August 1974 Charing Cross was renamed Charing Cross Embankment. The Jubilee line platforms and the refurbished Northern Line platforms opened on 1 May 1979 from which date the combined station including Trafalgar Square was given its current name; simultaneously Charing Cross Embankment reverted to the original BS&WR name of Embankment, ending 109 years of association with the name Charing Cross.
three extracts of the London Underground tube map showing how station names have changed at Embankment and Charing Cross stations
How the Charing Cross area of the London Underground Map looked in 1972 and 1979 alongside the same area in 2006
Although Charing Cross was constructed as the southern terminus of the Jubilee line, plans already existed to continue the line to the east towards Lewisham in south-east London. The tunnels were therefore constructed beyond the station beneath Strand as far as 143 Strand, almost as far as Aldwych station which would have been the next stop on the line. The subsequent regeneration of the Docklands in London's East End during the 1980s and 1990s required additional transport infrastructure and the eventual route of the extension took the new tunnels south from Green Park to provide new interchanges at Westminster, Waterloo and London Bridge stations and then on to Greenwich and Stratford.
The new tunnels branch away from the original south of Green Park station and, on the opening of the final section of the line between Green Park and Waterloo stations on 20 November 1999, the Jubilee Line platforms at Charing Cross were closed to the travelling public. The escalators continuing down to the closed platforms can, however, still be seen through closed doors at the bottom of the escalators from the ticket hall.